To work out concrete for a slab, multiply length by width by thickness, convert to cubic metres or yards, add a waste allowance, then divide by the yield of a bag or the volume of a delivered load. Measure carefully and keep the assumptions written down.
Start with the finished size
Measure the length and width of the area you intend to pour. For a simple rectangle, multiply the two numbers. If the slab is not square, split it into rectangles, calculate each one and add the areas together. Write each measurement down as you take it.
Thickness is the third dimension, and small errors here matter. A slab that is 100 mm thick needs less concrete than one at 150 mm over the same area. Use the thickness from your plan, not a guess, and keep all three measurements in the same unit.
If the ground is uneven, the amount of concrete can change significantly. Level the base first or allow extra material for the low spots. A calculator gives you the maths; the site conditions decide the assumptions.
Convert to volume correctly
In metric units, volume is cubic metres: length in metres times width in metres times thickness in metres. A thickness of 100 mm is 0.1 metres, not 100. Mixing millimetres and metres is the most common mistake in a manual calculation.
In imperial units, the same rule applies with feet. Many suppliers quote in cubic yards, so convert at the end rather than at every step. One cubic metre is about 1.31 cubic yards.
The SubMac concrete calculator accepts both metric and imperial inputs and shows cubic metres and yards side by side, so you can check the figure against a supplier quote.
Allow for waste
Waste covers spillage, uneven ground, over-excavation and the material left in a mixer or a truck. A straightforward rectangular slab on a level base may need only a small allowance; a sloped or irregular site needs more.
Add the waste percentage to the volume before you work out bags or loads. Keeping it as a separate, visible line means you can change it without redoing the whole calculation, and you can explain the figure to a client.
A common starting point is around ten percent, but treat that as an assumption to review, not a rule. Your own experience on similar ground is a better guide than any fixed number.
Bags or delivered concrete
For a small job, bagged concrete is convenient. Check the yield on the bag: an 80 lb bag and a 25 kg bag produce very different volumes. Divide the volume you need by the yield of one bag and round up, because a part bag is not useful.
For a larger slab, delivered concrete is usually easier. Suppliers quote by the cubic metre or yard and may have a minimum order. Ask about the minimum before you plan the pour, because it can change the total cost more than the waste allowance.
Keep delivery access in mind. If the truck cannot reach the site, you may need a pump or smaller loads, and that is a cost the calculator cannot estimate.
Worked example
Imagine a slab 4 metres by 3 metres and 100 mm thick. That is 4 × 3 × 0.1 = 1.2 cubic metres. Add ten percent for waste and you need 1.32 cubic metres. That is about 1.73 cubic yards.
If a 25 kg bag yields roughly 0.01 cubic metres, you would need around 132 bags. If you order delivered concrete instead, a single order near 1.5 cubic metres may be simpler once the supplier's minimum is known.
The example is for the method only. Substitute your own measurements, thickness and bag yield before ordering material.
Strength, mix and reinforcement
Volume tells you how much material to buy; it does not tell you whether the mix is right for the job. A garden path and a driveway carrying vehicles need different mixes, and local standards may specify minimum strength.
Reinforcement also affects the job, not the volume calculation. Mesh or rebar is measured separately, and the amount depends on the slab size, the ground and the loads it will carry. If you are unsure, ask a structural engineer or a qualified contractor.
Do not treat a calculator result as a specification. Use it to plan quantities, then follow the mix design and reinforcement details for your particular slab.
Preparation before the pour
A good base reduces surprises. Compact the ground, set the formwork level and check the corners are square. A slab poured into a poorly prepared area can need far more concrete than the calculation predicted.
Check the weather. Rain, extreme heat and freezing conditions all affect a pour. If conditions are poor, postponing is cheaper than repairing a weak surface.
Have your tools, reinforcement and helpers ready before the truck arrives. Concrete does not wait, and a delayed pour can turn a straightforward job into an expensive one.
From estimate to quote
Once you have the quantity and the price, turn them into a quote before you start. A quote sets out the area, the thickness, the assumed waste and anything excluded, such as ground preparation.
The concrete calculator has a 'Turn this into a quote' button that carries the line items across to the quotation generator. Add labour as a separate line and set a validity date, because material prices move.
Read the guide on writing a quote that wins the job for scope, terms and follow-up, or the markup vs margin guide if you are working out the price itself.
Checking the calculation twice
Before ordering, run the numbers a second time with fresh measurements. It is easy to transpose two digits or forget one section of an L-shaped slab. A second pass takes a minute and can prevent a costly short delivery.
Compare the calculator result with a rough mental check. For a small domestic slab, a figure in the region of a few cubic metres is usually plausible. If the answer is far larger or smaller than expected, check the units first, then the thickness, then the area.
Write the assumptions next to the result: the area, the thickness, the waste percentage and the bag yield. If you need to explain the order to a client or a supplier, those four numbers tell the whole story.
Odd shapes and multiple pours
For an L-shaped or curved slab, split the area into simple shapes and calculate each separately, then add the volumes. Overlap the boundaries slightly rather than leaving gaps, and note where you made the split so you can check it later.
If the job involves several pours at different thicknesses, keep them as separate lines. A patio at 100 mm and a driveway at 150 mm should not be averaged into one number. The supplier may also need separate delivery times.
Steps and footings are calculated differently from a flat slab and are covered by other modes in the SubMac concrete calculator. Keeping them separate stops you applying a slab formula to a shape it does not fit.
Ordering with confidence
When you call a supplier, give them the volume, the slab dimensions, the thickness and the site access. That is enough for them to confirm the quantity and flag any minimum order or delivery constraint. It also makes it easier to compare quotes from two suppliers.
Ask what happens if you need a little more on the day. Some suppliers can send a top-up load quickly; others cannot. Knowing the answer before the pour starts is better than discovering it when the forms are already full.
Keep the receipt and the delivery note with your project records. They show what was ordered and what arrived, which matters if the finished slab does not match the calculation and you need to understand why.
Frequently asked questions
How do I convert millimetres to metres?
Divide by 1,000. A 100 mm slab is 0.1 m thick.
How much waste should I allow?
It depends on the ground and the shape; around ten percent is a common starting assumption.
Do I need to subtract Reinforcement?
No. Reinforcement is measured separately from the concrete volume.
Can I use feet and inches?
Yes. Switch the calculator to imperial and convert your measurements.
Does the calculator specify the mix?
No. It estimates quantity only; use the correct mix for the job.
Free tools