SubMac guide · Updated 18 November 2026
How to write a quote that wins the job?
A good quote describes the customer's problem, the exact work you will do, a clear price with a method behind it, a timeline, a validity date and simple payment terms. Keep the language plain, break the price into visible line items and make the next step obvious.
What a quote is for
A quote is an offer. It tells a customer what you will do, what it will cost and for how long the price holds. It is not a contract in itself unless you say it is, and it is not an invoice because no money has changed hands yet.
The purpose of a quote is to make saying yes easy. That means answering the questions the customer will ask anyway: what exactly will I get, when will it be done, how much will it cost, and what happens if I want changes?
A quote that leaves those questions unanswered does not save you time. It creates a thread of messages, a rewritten price and usually a lower price, because the customer is negotiating against uncertainty.
Start with the customer's problem
Open with a short paragraph that describes the job in the customer's own terms. 'You need the kitchen floor tiled and the old tiles removed before the new units arrive on the 12th' shows that you have listened and understood the constraint that matters.
This is not the place for a long company history. One or two sentences about why you are suitable are enough. The customer is reading to find out whether you understand their job, not to learn your biography.
If you visited the site or had a call, refer to what you saw. It proves the quote was prepared for them rather than copied from a file.
Define the scope precisely
Write down what is included and, just as importantly, what is not. 'Supply and lay ceramic tiles to 12 m² of kitchen floor, including adhesive, grout and removal of existing tiles' is much clearer than 'tiling'.
List the assumptions you had to make: the subfloor is level, the customer will clear the room, the tiles they chose are in stock. If an assumption turns out to be wrong, everyone already knows the price may change.
Separate optional items into their own lines. A customer who wants to decide later about a feature wall or an extra coat of paint can say yes to the main job without feeling they have been pushed into extras.
Break the price into visible lines
A single number invites a single question: how did you get that? Break it into materials, labour and any other costs, with quantities and rates. The customer can then see that the price is built from real inputs rather than pulled out of the air.
Use a consistent unit. If you price labour by the hour, say how many hours you have allowed. If you price by the square metre, say the area you measured. Consistency makes the quote easy to compare with other quotes and easy for you to defend.
Show the discount and tax as separate lines if they apply. Hiding arithmetic does not make a price look more professional; showing it usually does the opposite.
Price with a method, not a guess
Start with the rate you need. Work out the income you want, add your yearly business costs, allow for tax and profit margin, and divide by the hours you can realistically bill. That gives you a floor below which the job loses money.
Then check the market. Your rate has to be believable for the area and the type of work, but the calculation tells you what happens if you discount it. A customer asking for a lower price is much easier to answer when you know exactly what you are giving up.
For materials, use a supplier price rather than an estimate where possible, and include a waste allowance. A quote that ignores waste tends to become an awkward conversation halfway through the job.
Timeline, validity and payment terms
Say when the work can start, how long it will take and anything the customer needs to do first, such as clearing a room or approving a colour. A timeline is part of the value you are offering, not an optional extra.
Put a validity date on the quote. Prices for materials change, and a quote that is open forever is a risk to you. Two to four weeks is common; choose a period that suits how quickly you can start the work.
State the payment terms. For a larger job, a deposit followed by a balance on completion is normal. Say what the deposit covers and when the balance is due. If you need materials ordered before the job can start, explain why the deposit is needed.
Present it clearly
A clean one- or two-page PDF is easier to read than a long document or a message thread. Use the same name and branding you use on your invoices so the customer recognises you at the next stage.
Avoid jargon. Words like 'scope', 'variation' and 'milestone' are fine if your customer uses them, but plain language is safer. If a term has a specific meaning, explain it in a line.
End with one clear next step: reply to confirm, sign and return, or pay the deposit to book the date. A quote with three possible next steps often gets none of them.
Follow up without pestering
Send the quote, then follow up a few days later with a short, useful message. Ask whether they have any questions rather than asking whether they have decided. It is an easier message to answer and it often surfaces the real objection.
If the answer is no, ask what would have made the quote a yes. The feedback is more useful than the job you did not get, and it tells you whether to change your scope, your price or the way you present it.
Keep a copy of every quote and note the outcome. Over time you will see which wording and which prices lead to accepted work.
Mistakes that lose jobs
Vague scope is the biggest one. The customer cannot compare a vague quote with a clear one, so they compare price alone and the clearer quote often wins even when it costs more.
The second is underpricing because the hourly rate was never worked out properly. A quote that wins the job and loses you money is not a win.
The third is forgetting the deposit and the validity date. Both are small lines on the page that protect a great deal of work.
Free tools for the job
Start with the quotation generator on SubMac. Add line items, a deposit and a validity date, then download a clean PDF. If the customer accepts, convert the same details into an invoice in the browser.
Use the hourly rate calculator to find the rate your quote must cover, and the profit margin calculator if you are building a price from costs.
Read the guide on what to include on an invoice for the next stage.
Quotes, estimates and proposals
These words are often used interchangeably, but they do different jobs. An estimate is a rough guide to the likely cost. A quote is a fixed price for a defined piece of work. A proposal is a wider document that may include the approach, the team and the reasoning as well as the price.
Know which one the customer has asked for. If they want a quote, give them a fixed price and clear scope. If they want an estimate, say that the final price will follow once the scope is agreed. Confusing the two creates expectations you then have to manage.
For small domestic and trade jobs, a one-page quote is usually enough. For larger work, a short proposal with the quote attached can help the customer compare you fairly. Keep the extra pages focused on how you will do the work, not on how long you have been in business.
Frequently asked questions
How long should a quote be valid?
Long enough for the customer to decide, short enough that your material prices still hold. Two to four weeks is common.
Should a quote include a deposit?
For larger jobs, yes. State the amount and what it covers.
Do I need to include my hourly rate?
Not always, but showing the hours you allowed makes the price easier to understand.
Can I convert a quote into an invoice?
Yes. The SubMac quotation generator carries the line items across when the quote is accepted.
What if the job changes?
Agree the change in writing before doing the extra work and price it as a separate line.